About us| FAQ| Contact us| Make Steelguru your Homepage | RSS
Toplogo   FAIL (the browser should render some flash content, not this).
 
 Also Read
0blt1SAIL RSP achieves highest production in 2008
0blt1Call for merger of Burn Standard Salem unit with SAIL
0blt1CAPEX cuts - SAIL RSP to go ahead with expansion plans
0blt1SAIL RSP adopting cost cutting measures
0blt1SAIL BSP posts best ever April to December performance
 
 Indian News
0blt1TATA Steel sales in Q3 dip by 14% YoY
0blt1Indian steel price index declines due to long product slide
0blt1Indian long product prices dip in South
0blt1Indian flat products prices remain stable
0blt1Indian steel ministry measures to tackle global financial crisis
0blt1TATA Steel seeks Orissa and Jharkhand help for projects
0blt1Input material prices remain stable in India
0blt1Land losers protest at Essar steel project site in Orissa
0blt1TATA Steel Jamshedpur plant expansion almost complete
0blt1Indian Freight Exchange launched
0blt1Slowdown signs - Slump looms over tanker segment
0blt1Lord Paul sees India emerging as manufacturing hub
0blt1Indian investor to build steel plant in Indonesia
0blt1Recession reports - CITU suggests ways to overcome crisis
0blt1Paradip port invites financial bids for 2 deep draught berths
0blt1Railways may unveil new schemes for containerized freight operators
0blt1KPCL to sign pact with BHEL
0blt1APGenco to join hands with NPCIL
0blt1Macroeconomic indicators - Stanchart sees 6.3% growth
0blt1Stimulus package-II neglects exporters - FIEO
0blt1Plea for replacing old rails in Madurai
0blt1Truck strike in India
0blt1TATA Power moves to court on Sasan coal matter
0blt1BHEL speed up 3 power projects in Karnataka
0blt1OPGC to revive 5 mini hydel projects in Orissa
0blt1CESC to achieve financial closure Orissa power plant by 2010
0blt1GPPL starts dredging at Pipavav port in Gujarat
0blt1Port and dock workers seek wage revision every 5 years
 
 
News Wednesday, 07 Jan, 2009
SAIL awards BSP CHP contract to HEC

Ranchi Express reported that Heavy Engineering Corporation Limited has bagged a prestigious order worth INR 500 crore amid tough global competition for manufacturing a coal handling plant for Steel Authority of India Limited’s Bhilai Steel Plant. The project has to be completed within 30 months from the date of award of work by the steel plant.

The work order includes the design, engineering, manufacture, supply, testing and commissioning of the coal handling plant from concept to designing. The major equipment to be supplied by HEC includes wagon tippler, electric car pushers, conveyors, civil and structural work and associated auxiliary equipments.

This is the second time in February 2008 that Heavy Engineering has bagged a massive order for the Bhilai Steel Plant, bringing its total work order from a single source to a whopping INR 700 crore. Earlier, on February 1st 2008, it had clinched an order for augmentation of ore handling plant at Bhilai Steel for a total value of INR 200 crore.

Heavy Engineering got the order after competing with Larsen & Toubro, McNally Bharat Engineering Co and Elecon Engineering.

 
Post Comments  Read Comments  Forum
 
Chinese News Indian News Intenational News Middle East News
Russian News Stainless & Special Steel News Raw Material & Mining News


 
User Comments

No comment for this news

 
Add Comment
 
Name:
Email:
Comment:
 
 

Copyright © 2004 - SteelGuru and respective copyright holders. All rights reserved.
Site optimized for Internet Explorer 6.0 and above.
Disclaimer| Privacy Policy| About us| Feedback| Contact us| FAQ| Site Map