Sglogo_1

 

Events Reports Directory Forum Articles Jobs in Steel Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

December 02, 2008


Kirloskar Brothers bags LoA for Koderma power project

Damodar Valley Corporation has issued a letter of acceptance to Kirloskar Brothers for the water system package at 1000 MW Koderma thermal power project stage I in Jharkhand.

The total value of the contract is INR 166.77 crore. The scope of work involves supply and installation of balance of plant package. It also includes construction, erection, testing, inspection and commissioning and handing over of the project including all associated electrical civil, structural and architectural work as specified.