Sglogo_1

 

Events Reports Directory Forum Articles Job Post Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

October 07, 2008


Changgang H beam day production crosses 2300 tonnes

It is reported that Changgang’s H beam cumulative production had reached 25,200 tonnes up to May 12th 2008 and the highest daily output reached 2311.6 tonnes.

Its H beam plant has taken following initiatives
1) Optimize the products structure, to realize the capacity maximum
2) Strictly stick to maintenance schedules
3) Strengthen the incentive mechanism
The measures have effectively promoted the production progress of H beam.