About us| FAQ| Contact us| Make Steelguru your Homepage | RSS
Toplogo   FAIL (the browser should render some flash content, not this).
 
 Also Read
0blt1GPPL starts dredging at Pipavav port in Gujarat
0blt1KoPT to renew Dredging Corporation contract
0blt1Dredging required at Gwadar Port to maintain draft
0blt1BHP gets harbor dredging permission
0blt1L&T JV ISD to buy two dredging ships for INR 100 crore
 
 Indian News
0blt1TATA Steel sales in Q3 dip by 14% YoY
0blt1Indian steel price index declines due to long product slide
0blt1Indian long product prices dip in South
0blt1Indian flat products prices remain stable
0blt1Indian steel ministry measures to tackle global financial crisis
0blt1TATA Steel seeks Orissa and Jharkhand help for projects
0blt1Input material prices remain stable in India
0blt1Land losers protest at Essar steel project site in Orissa
0blt1TATA Steel Jamshedpur plant expansion almost complete
0blt1Indian Freight Exchange launched
0blt1Slowdown signs - Slump looms over tanker segment
0blt1Lord Paul sees India emerging as manufacturing hub
0blt1Indian investor to build steel plant in Indonesia
0blt1Recession reports - CITU suggests ways to overcome crisis
0blt1Paradip port invites financial bids for 2 deep draught berths
0blt1Railways may unveil new schemes for containerized freight operators
0blt1KPCL to sign pact with BHEL
0blt1APGenco to join hands with NPCIL
0blt1Macroeconomic indicators - Stanchart sees 6.3% growth
0blt1Stimulus package-II neglects exporters - FIEO
0blt1Plea for replacing old rails in Madurai
0blt1Truck strike in India
0blt1TATA Power moves to court on Sasan coal matter
0blt1BHEL speed up 3 power projects in Karnataka
0blt1OPGC to revive 5 mini hydel projects in Orissa
0blt1CESC to achieve financial closure Orissa power plant by 2010
0blt1GPPL starts dredging at Pipavav port in Gujarat
0blt1Port and dock workers seek wage revision every 5 years
 
 
News Thursday, 08 Jan, 2009
Dredging work starts at Paradip Port

SNS reported that dredging work of the Paradip channel has started with Mr K Raghuramaiah chairman of Paradip Port Trust inaugurating the program on board the dredger CSD Aquarius.

Describing the dredging as one of the most important developmental and expansion project of the port, Mr Raghuramaiah has highlighted various developmental works undertaken by the trust. Initially the dredging work will be done by the cutter and suction dredger CSD Aquarius and subsequently higher capacity dredgers will be deployed to cater to the requirement.

The dredging work is awarded to the Dredging Corporation of India. While the total cost of work amounts to INR 253.36 crore, it is expected that it would be complete by June 2009.

The total work includes 15 million cubic meters of dredging which includes 11.3 cubic meters dredging in the outer channel and 3.7 million cubic meters of dredging from the turning circle and the harbor inside. On completion of the, the depth of the entrance channel will be increased from 12.8 meter to 17.1 meter. By deepening the approach channel and entrance channel, the port will be in a position to handle cape size vessels of 125,000 DWT capacity.

 
Post Comments  Read Comments  Forum
 
Chinese News Indian News Intenational News Middle East News
Russian News Stainless & Special Steel News Raw Material & Mining News


 
User Comments

No comment for this news

 
Add Comment
 
Name:
Email:
Comment:
 
 

Copyright © 2004 - SteelGuru and respective copyright holders. All rights reserved.
Site optimized for Internet Explorer 6.0 and above.
Disclaimer| Privacy Policy| About us| Feedback| Contact us| FAQ| Site Map