Toplogo
FAIL (the browser should render some flash content, not this).
 
 
News
Friday, 04 Jul 2008
Pdf_buttonEmailButton
Liugang No 2 converter put into production
Friday, 04 Jul 2008

It is reported that Guangxi Liuzhou Iron and Steel Group 150 tonnes converter No 2 furnace formally put into production.

As per report, general manager and chief engineer of Liuzhou Iron and Steel Group and some other leaders attended the commissioning ceremony.

The No.2 converter is another important engineering project after its No 1 converter. The No.3 converter is expected to be put into operation in mid August 2008.

   

Copyright © 2004 - SteelGuru and respective copyright holders. All rights reserved.
Site optimized for Internet Explorer 6.0 and above.
Disclaimer| Privacy Policy| About us| Feedback| Contact us| FAQ| Site Map