About us| FAQ| Contact us| Make Steelguru your Homepage | RSS
Toplogo   FAIL (the browser should render some flash content, not this).
 
 Also Read
0blt1ER-BAKIR modernizes CONTIROD copper rod plant
 
 Middle East News
0blt1Construction work initiated on Chinese Yemeni JV steel plant
0blt1HDG prices in Iran expected to fall
0blt1Relocation of steel units in Pakistan yet to reach a consensus
0blt1MEASPI - Barometer for steel prices in Middle East Asia
0blt1Pakistan Red Cross distributes CGI shelters to quake victims
0blt1Reverse migration hits Gulf labor force
0blt1Iraq oil sales rose by 49% in 2008
0blt1CPC announced second Industrial firm in Egypt
0blt1Scorpion receives LOI for new build rig
0blt1Agility Qatar to merge with Gulf Warehousing
0blt1Dana Gas says global crisis not to affect performance in 2009
0blt1SteelFab show attracts higher Italian participation
 
 
News Saturday, 10 Jan, 2009
ER-BAKIR modernizes CONTIROD® copper rod plant

ER BAKIR, Elektrolitik Bakir Mamulleri AS at Denizli in Turkey has placed an order with SMS Meer GmbH for the modernization of its existing CONTIROD® copper rod plant.

The aim of the comprehensive modernization measure is to increase the output from currently 18 tonne per hour to 30 tonne per hour of copper wire rod in the future. The modernization of the plant is scheduled for summer 2009.

The CONTIROD® plant was commissioned in 1999. SMS Meer’s modular design concept now makes it possible to easily integrate additional components into the line. For example, additional burners will increase the melting capacity of the shaft furnace, the energy efficiency will be improved by raising the height of the existing shaft furnace and a new higher-performance charging system will be installed to meet the higher melting capacity.
Further activities will include the modification of the HAZELETT twinbelt caster for a larger casting cross-section. At the same time, the fundamental principle of the solidification of the melt in a straight line with the associated benefits for the product quality will be retained. Two additional mill stands will be installed in the rolling mill to handle the larger casting cross-section.

During the course of the modernization, the electrical equipment of the CONTIROD® plant will be equipped with the latest PLC equipment. Process monitoring will be optimized to ensure a consistently high product quality. The new system components will also ensure the long-term availability of spare parts, a major advantage on the rapidly changing market for electrical automation.

 
Post Comments  Read Comments  Forum
 
Chinese News Indian News Intenational News Middle East News
Russian News Stainless & Special Steel News Raw Material & Mining News


 
User Comments

No comment for this news

 
Add Comment
 
Name:
Email:
Comment:
 
 

Copyright © 2004 - SteelGuru and respective copyright holders. All rights reserved.
Site optimized for Internet Explorer 6.0 and above.
Disclaimer| Privacy Policy| About us| Feedback| Contact us| FAQ| Site Map