Sglogo_1

 

Events Reports Directory Forum Articles Jobs in Steel Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

November 21, 2008


Pioneer Distilleries to complete its 5 MW biogas project soon

It is reported that Pioneer Distilleries Limited work on 5 MW biogas based power project is expected to be completed by September and start commercial production from October.

As per report, Pioneer Distilleries Limited work entered into a power purchase agreement with TATA Power Trading Company Limited for the entire power generated by the plant. The PPA is valid for 10 years from commercial operation date and the applicable annual average base rate for power purchase shall be INR 4 per kWh for the first year.