Sglogo_1

 

Events Reports Directory Forum Articles Jobs in Steel Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

November 20, 2008


Petrovskiy SW to Commission BF No 2 in July

According to Metal Courier, Petrovskiy Steelwork DMZP UZ N/R plans to commission blast furnace No 2 on July 25th 2008.

The BF ended a 45 day overhaul that was aimed at its reconstruction without capacity changes.

Millennium Capital analyst said that “In December 2007 DMZP announced its production targets of 1.28 million tonnes of steel in 2008. This translates into roughly 1.2 million tonnes of rolled steel down by 5.3% YoY. Our 2008 rolled steel output expectations which are based on H1 2008 production dynamics and announced modernization plans are close to the management plans.”

(Sourced Millennium Capital)