Toplogo
FAIL (the browser should render some flash content, not this).
 
 International News
 
News
Wednesday, 22 Jul 2009
Pdf_buttonEmailButton
Kawasaki Heavy wins steam turbine order from POSCO
Wednesday, 22 Jul 2009

Kawasaki Heavy Industries Limited announced that it has received an order for a steam turbine generator from Korean steel manufacturer POSCO. The steam turbine generator will be installed in a coke dry quencher.

The CDQ quenches red hot coke, dried by distillation in a coke oven, with inert gas and recovers sensible heat using a boiler to generate steam for power generation. The steam turbine generator will be delivered to POSCO's Gwangyang Steel Works in 2010.

Kawasaki launched its first industrial steam turbine in 1956. Since then it has established a track record that includes the delivery of about 340 steam turbine units, including a past delivery of CDQ steam turbines to POSCO. This latest order from POSCO is a testament to the superior performance and lifecycle cost of Kawasaki steam turbines as well as its outstanding reliability and proven track record.

(Sourced from www.khi.co.jp)

 

Copyright © 2004 - SteelGuru and respective copyright holders. All rights reserved.
Site optimized for Internet Explorer 6.0 and above.
Disclaimer| Privacy Policy| About us| Feedback| Contact us| FAQ| Site Map