Antioquia Gold Inc announced an update of production at its Cisneros mining operation, and to report on the actions underway to improve the results obtained to date. During the last seven months of operation, the Company continues to gradually increase the treatment rate in its plant and has already exceeded its design capacity of 500 tonnes per day. A treatment rate of 600 TPD is expected to be achieved with the current equipment.

Some aspects to highlight from the first seven months of operation are:

1. Metallurgical recovery remains close to 94%, 4% more than expected in designs.

2. The treatment rate in the last month reached 562 TPD.

3. The average processing grade has been 2.69 g/t Au with monthly peaks of 2.90 g/t Au and minimum of 2.20 g/t Au. These variations are a function of the percentage of narrow veins contributing to the total feed.