Help Desk -
9958816305, 9810335381
Email
Password

Armour Energy Update on Myall Creek #5A Well

Gasoil News - Published on Fri, 17 Jan 2020

Image Source: squarespace-cdn.com
The Directors of Armour Energy Ltd have provided an update on the Company's operations at the Myall Creek #5A well located in its 100% owned PL511 and Horseshoe #4 located in 100% owned PL227. As per the Company's announcement of 24 December 2019, Myall Creek #5A commenced flowback operations on 22 December 2019, and by 23 December 2019 had achieved a flow rate of 2.37MMSCF/d before being shut in over the Christmas period.

On 4 January 2020, Armour recommenced flowback operations on Myall Creek #5A, with production rates from the well continuing to climb to 4.23MMSCFd and a flowing wellhead pressure of 1364psi with associated condensate production.

Armour is extremely encouraged by the result of the Myall Creek #5A well. Production from the well is currently in the process of being connected to the existing sales gas pipeline infrastructure.

Source :

Posted By : Rabi Wangkhem on Fri, 17 Jan 2020
Related News from Gasoil segment