Help Desk -
9958816305, 9810335381
Email
Password

GE to Provide Advanced Gas Turbine Technology for Reliance Bangladesh LNG & Power Plant

Power News - Published on Mon, 03 Aug 2020

Image Source: GE Reliance Bangladesh LNG Power
GE announced that it will be providing its advanced gas turbine technology upgrade Advanced Gas Path for the upcoming Reliance Bangladesh LNG & Power Ltd.’s 718-megawatt combined cycle power plant in Meghnaghat, Bangladesh. Reliance Bangladesh LNG & Power Ltd is a joint venture between India’s Reliance Power and Japan’s JERA. Built by Engineering, Procurement, & Construction group Samsung C&T, Meghnaghat power plant will be powered by two GE 9F gas turbines, one GE D11 steam turbine and three H53 generators. The power plant will utilize re-gasified liquified natural gas fuel to generate the equivalent electricity needed to supply more than 850,000 homes in Bangladesh.

GE’s contract with Samsung C&T includes GE’s AGP upgrade for two GE 9F.03 gas turbines, steam turbine refurbishment along with control upgrades and parts supply. Once implemented, the upgrade solution will help in delivering up to 6.7% increase in power output, up to 3.3 % improvement in heat rate, up to 2% increase in efficiency, enhanced operational flexibility and extending the maintenance interval up to 32,000 hours.

Source :

Posted By : Yogender Pancholi on Mon, 03 Aug 2020
Related News from Power segment