Help Desk -
9958816305, 9810335381
Email
Password

Hyundai Engineering Presents Plan for Underwater Tunnel in Vietnam

Infra News - Published on Fri, 11 Oct 2019

Image Source: Business Korea
Hyundai Engineering & Construction and the Quang Ninh Province of Vietnam had a meeting on October 3 to discuss the construction of an underwater tunnel between Bai Chay and Hon Gai. Hyundai presented a specific business plan at the meeting. The total construction cost is estimated at 504.6 billion won, the total length of the facility is estimated at 2,750 meters, the total length of the tunnel section is estimated at 2,140 meters, and the facility is likely to be a six-lane road. In addition, the tunnel is going to be located 17 meters below the water surface once completed in 2025 based on a public-private partnership.

In fact, the two regions are already connected via the Bai Chay Bridge. However, additional infrastructure has been called for with the local traffic volume increasing.

Source :

Posted By : Sanju Moirangthem on Fri, 11 Oct 2019
Related News from Infra segment