Help Desk -
9958816305, 9810335381
Email
Password

Nexans celebrates Construction of Aurora Cable Installation Vessel

Logistic News - Published on Tue, 22 Oct 2019

Image Source: https://www.nexans.com
On 15 October 2019, Nexans hosted the grand block ceremony that represented a key step in the construction of its ground-breaking cable installation vessel, the ‘Nexans Aurora’. The vessel’s hull is currently being built at the CRIST shipyard in Poland. It will be completed at Ulstein Verft in Norway, with delivery planned for 2021. The grand blocks are the major components in the construction of the hull. They are being assembled at CRIST, in the Polish port of Gdynia. Representatives from Nexans, the shipbuilders, the ship designer and other project partners were present at the celebration.

The Aurora design is based on the combined experience of Nexans, Skipsteknisk, Ulstein Verft and MAATS Tech, each world leadiers in their own fields. The aim is to produce a subsea cable and umbilical systems installation vessel for worldwide operations, covering the full range of shallow and deep subsea activities. With a 10, 000 ton capacity, split turntable, and a world leading vessel design, Aurora is well prepared for complex construction tasks in severe weather conditions anywhere in the world.

Nexans Aurora builds on over a century of Nexans’ experience in submarine cable installation to bring cable installation to the next level in terms of capacity and capability.

Source :

Posted By : Mohan Sharma on Tue, 22 Oct 2019
Related News from Logistic segment