Help Desk -
9958816305, 9810335381
Email
Password

SAIC Volkswagen JV Anting Plant in China Starts Pre Production

Auto News - Published on Mon, 11 Nov 2019

Image Source: uploads.volkswagen-newsroom.
The new plant of the SAIC Volkswagen joint venture has been completed in China. It is purely built for the production of all electric vehicles on Volkswagen’s Modular Electric Drive Matrix. Celebrating the start of pre-production, a first China-specific all electric Volkswagen ID. model rolled off the production line. The plant sets the next milestone in Volkswagen’s global electrification strategy. The start of series production of all electric cars based on the MEB platform in Anting is scheduled for October 2020.

Full series production in the new Anting factory is planned to commence in October 2020, with an annual capacity of 300,000 vehicles. The MEB production plays a key role in Volkswagen Group China’s e-mobility strategy, as it strives to transform into a provider of sustainable mobility. The Anting plant is scheduled to start ID. model production at the same time with a plant by FAW-Volkswagen in Foshan, resulting in a combined capacity of 600,000 units per year.

The first phase of pre-production in Anting starts now with a China-specific ID. model of the Volkswagen Brand. In the future, the plant will be manufacturing MEB platform-based BEV models for various Volkswagen Group brands. In total, it is planned to increase the local production in China up to 15 MEB models from different brands by 2025.

Source :

Posted By : Yogender Pancholi on Mon, 11 Nov 2019
Related News from Auto segment