Help Desk -
9958816305, 9810335381
Email
Password

Skeena Resources Intersects 16.64 g/t Au over 5.10 m in 200 Footwall at Snip

Mining News - Published on Fri, 17 Jan 2020

Image Source: ytimg.com
Skeena Resources Limited announced the remaining analytical results from the 2019 Phase I surface exploration drilling program at the 100% owned Snip gold project located in the Golden Triangle of British Columbia. The 2019 exploration program consisted of 10 surface drill holes totaling 1,934 m which tested the 200 Footwall Corridor.

2019 Phase I Snip Project Drilling Highlights:
16.64 g/t Au over 5.10 m (S19-035)
Including: 96.20 g/t Au over 0.50 m
And 39.80 g/t Au over 0.85 m
57.90 g/t Au over 0.65 m (S19-041)
57.00 g/t Au over 0.50 m (S19-041)
12.00 g/t Au over 1.35 m (S19-043)

Core lengths are reported due to a lack of supporting data to properly calculate true widths. Length weighted composites were constrained by geological and grade considerations. Grade capping of individual assays has not been applied to the Au assays informing the length weighted composites. Samples below detection limit were nulled to a value of zero.

Source :

Posted By : Rabi Wangkhem on Fri, 17 Jan 2020
Related News from Mining segment