Help Desk -
9717405332, 9599714297, 9810335381
Email
Password

Universal Copper Announces 2019 Drilling on Poplar Property

Mining News - Published on Thu, 22 Aug 2019

Image Source: Acceswire
Universal Copper Ltd reported the commencement of the 2019 drilling campaign at its 62,000 hectare Poplar copper property, southwest of Houston, British Columbia. The purpose of this program will be to expand the known copper deposit to depth, and the initial drill campaign will encompass a 550 meter vertical hole. Additional holes are in the planning stages. Universal Copper completed a widely spaced three-hole diamond drill program late in 2018.

Highlights from the drilling campaign include:

1. 18-PC-126 was mineralized from top of bedrock to full depth, averaging 0.365% Cu, 0.015% Mo, 0.145g/t Au and 2.31 g/t Ag over 380.97 metres. The last 30.17 metres contained the strongest mineralization: 0.554% Cu, 0.027% Mo, 0.104g/t Au and 4.44 g/t Ag; indicating the historic IP conclusion of mineralization continuing to depth appears valid.

2. 18-PC-127 was mineralized from top of bedrock to full depth, averaging 0.421 % Cu, 0.013% Mo, 0.105g/t Au and 2.63 g/t Ag over 264.86 metres, including a 27 metre interval averaging 0.643% Cu, 0.030% Mo, 0.146g/t Au and 2.62 g/t Ag.

3. 18-PC-127 intersected 0.330% Cu, 0.002 % Mo, 0.118 g/t Au and 3.46 g/t Ag over 151.10 metres between 122.8 metres and 273.9 metres

4. Mineralization consists of both dissemination pyrite and chalcopyrite and stockwork vein to veinlet pyrite, chalcopyrite and molybdenite.

5. The following table provides the statistics for the three drill holes. Each hole was sampled from top of bedrock to full depth in intervals ranging from 1.0 to 3.0 metres.

Source :

Posted By : Sanju Moirangthem on Thu, 22 Aug 2019
Related News from Mining segment