Help Desk -
9717405332, 9599714297, 9810335381
Email
Password

PM Modi lays foundation stone for Trichy airport integrated terminal building

Infra News - Published on Mon, 11 Feb 2019

Image Source: Times of India
Prime Minister Narendra Modi on Sunday laid the foundation stone for the new integrated passenger terminal building at the international airport in Trichy, through video-I conferencing from Tirupur. j The new terminal building would come up at an estimated cost of INR 951 crore near the existing terminal building. The project is expected to be completed on October 18, 2021

The Airport Authority of India (AAI) has already sanctioned INR 951 crore for the construction of the 61,634-square-meter integrated terminal building, along with a new apron and Air Traffic Control (ATC) tower. Out of the total outlay of INR 951 crore, INR 564 crore has been allotted to construct an integrated terminal building.

The new two-level modular integrated passenger terminal building would be fully air-conditioned to handle 3.63 million passengers a year on full capacity and 2,900 passenger during peak hours with provision for expansion. The new building will have incorporating local themes.

Source :

Posted By : Rabi Wangkhem on Mon, 11 Feb 2019
Related News from Infra segment