Help Desk -
9717405332, 9599714297, 9810335381
Email
Password

Vestas secures first multi-brand repowering order from PacifiCorp

Power News - Published on Mon, 03 Dec 2018

Image Source: tibco.com
Vestas has received an order from PacifiCorp, a subsidiary of Berkshire Hathaway Energy, for 47 V110-2.0 MW turbines, delivered in 2.2 MW Power Optimised Mode, to repower the Goodnoe Hills wind project in Washington, US. With the order, PacifiCorp repowers the projects’ existing 47 Senvion MM92 2MW turbines, increasing the project’s nameplate capacity from its original 94 MW to 103 MW. The project was originally commissioned in 2008.

Repowering existing and aging wind projects with new wind turbine technology offers substantial returns from increased annual energy production and reduced operating costs. Through repowering, owners and operators benefit by replacing old equipment with advanced technology, while significantly lowering operating costs.

With the largest global installed capacity and service base, Vestas is uniquely positioned to harness operational and technical insights gained from the largest wind data repository in the world, to develop repowering solutions for Vestas and non-Vestas wind turbines alike. With the Goodnoe Hills order, Vestas showcases its ability to apply technical insights and capabilities to develop and certify multi-brand repowering solutions.

Source :

Posted By : Nanda Koijam on Mon, 03 Dec 2018
Related News from Power segment