Sglogo_1

 

Events Reports Directory Forum Job Post Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

July 25, 2008


Rautaruukki’s first total delivery in Estonia successfully completed

It is reported that Rautaruukki’s first supply of structures to Estonian customer Joestoni Investeeringu AS for The warehouse and commercial premises serving as DHL’s logistics centre at Tallinn has been completed.

Ruukki was responsible for the design and manufacture of the wall, roof and frame structures, as well as for installation and other work to ensure implementation of the main contract. The project started in July 2007.

Ruukki designed, delivered and installed the sandwich wall panels of 4,500 square meters, load bearing profiles of 7,200 square meter and steel frames of 190 tonnes.

Mr Lasse Jokinen owner of Joestoni Investeeringu AS which is part of Jokinen Yhtiö said that “Ruukki’s total solution served our needs extremely well and also lowered costs. We are pleased with Ruukki’s delivery.”